Interrupted Time Series Segmented Regression Analysis


The below document contains the data for the water level changes of the Nile River from 1870 to 1970. The segmented regression is used to test the change in level and slope of the Nile River at the year of 1899. Data manipulation was done in R, and the analysis was done in SAS.

No comments:

Post a Comment